
Add to Cart
Dongfeng 2 cbm -3 cbm water tank fire fighting Truck , Jinka Cab 90hp
Description & application:
1-It can do rescue job.
2-It can do transport job
3-it can do sanitation job
Competitive Advantage:
1- strict quality control ---- stable quality for each truck
2- powful R & D capabilities ---- we can design and produce the truck according to different fire equipment of different countries so that it can be fit for different countries’ demand.
3- best service ----- we cherish each customer and opportunity.
Dongfeng 2 cbm -3 cbm water tank fire fighting Truck , Jinka Cab 90hp
Vehicle Description | |||
Type | 4*2 water truck | Overall dimensions(mm) | 5820*1940*2080 |
GVW (kg) | 6495 | Mass in working order (kg) | 2850 |
Fact cubage | 3.5 | Max speed (Km/h) | 95 |
Chassis Description | |||
Cab | Single | Chassis Mod | EQ1060TJ20D3 |
Allowable Passengers In Cab | 3 | Air conditioner | Optional |
Wheel base(mm) | 3300 | Number of axles | 2 |
F/R track base(mm) | 1506/1466 | F/R overhang(mm) | 1032/1488 |
Approach/Departure angle(°) | 19/15 | Spring plate | 8/9+5,6/8+4 |
F/R axle-load | 2595/3900 | Type of fuel | Diesel |
Tire specification | 7.00-16 | Tire quantity | 6 |
Traction system | 4*2 | Operation control system | Air braking |
Braking system | Steering wheel | Electric system | 24V |
Engine Description | |||
Engine model | YC4F90-30 | ||
Exhaust/output | 2659/66 | Horse power | 90 |
Engine Manufacturer | Guangxi Yuchai Machinery Co., Ltd. | ||
Up-parts Description | |||
Tank Dimensions(mm) | 2400*1200*800 | ||
Tank Description | 1. Shape:oalv 2. Material:carbon steel4214
3.Thickness:5mm All water truck can be make water wagon for transporting drinkinrg wate. | ||
Standard Equipment | Equipped with front,rear, side sprinkler (sprinkling width>14m ) Equipped with rear working platform with water cannon which can be turned all-round (range>28m),can be adjusted into flinging, heavy rain,light rain,drizzle model, with security barrier. Equipped with Hangzhou Weilong pump(suction lift>6m) Equipped with fire valve, water valve, and filter gauze | ||
Optional Equipment | Shower ,pneumatic valve,Honda pump,tool box Optional other tire model | ||
Production cycle | 7-15 days | ||
FOB shanghai | / |